LATEST NEWS
March 13, 2007
A larger and enhanced Peace Garden epitomizes the design chosen to restore Nathan Phillips Square back to the 'original vision’ of Toronto’s centre of government.
Nathan Phillips Square reduxed
TORONTO
A joint venture submission by two Toronto architectural firms that envisions transforming Nathan Phillips Square into a green oasis through an array of sustainability features is the winner of the international design competition to revitalize the civic space.
The Plant Architect Inc. & Shore Tilbe Irwin design was announced by University of Waterloo’s School of Architecture director Eric Haldenby, chair of the six-person competition jury which had short-listed four finalists from 48 proposals in the two-stage competition.
In reaching its decision, the jury noted how the winning submission respects and restores the “beauty and dignity of the original vision” of Vilgo Revell, the Finnish architect who designed city hall and the square in the late 1950s, said Haldenby.
The design is based on the idea the square as an agora —the ancient Athenian place of public and political exchange.
It calls for a public food concession and a skate rental pavilion; a new glass tourist information pavilion at Queen and Bay streets; a two-level restaurant in the southwest portion of the square; a larger and an enhanced Peace Garden at a new location in the western landscaped area of the square, and a new permanent and versatile stage.
The winning design to rejuvenate Nathan Phillips Square in Toronto’s downtown focuses on the drive for sustainability.
Other elements would include a water fountain system and a relocated and redesigned entry to the city’s underground pedestrian system.
At the heart of the design, however, is the drive for sustainability.
“We’ve scored the project with the goal of achieving LEED Gold rating,” said Plant Architect partner Chris Pommer.
Some of the key planks in that goal include planting full growth trees along the square’s edges at Bay and Queen streets; the installation of a structural cell system to support that growth, bicycle facilities, controlling light pollution and new green roof on the city hall podium — with the pulverization and recycling of the podium’s existing concrete pavers when construction gets underway, he said.
The three other competition finalists were: Baird Sampson Neuert Architects, Toronto; Rogers Marvel Architects, New York, Ken Smith Landscape Architect, New York, du Toit Alsop Hillier, Toronto; and Zeidler Partnership Architects, Toronto.
Miller acknowledged that while the city has committed $16 million towards the $40 million project, funding from other government levels and partnerships with the private sector are needed to cover the balance.
But advertising and “commercial intrusion” into the square should not be used to make up that shortfall, said jury chair Eric Haldenby. Instead, the jury is recommending that a portion of the fees from city hall underground garage be used to finance the construction and ongoing maintenance of a rejuvenated square.
| MOST POPULAR STORIES |
- Steel hurdles for Aga Khan Museum build
- Benson Steel faces transport challenge on Toronto Yorkdale Mall construction project
- York Region, Ontario approves subway construction expenditures
- Bidding closes for Toronto 2015 Pan Am games venues
- Toronto Construction Association presents ‘Best of the Best’ awards
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 316 projects with a total value of $1,890,889,993 that Reed Construction Data Building Reports reported on Thursday.
$65,000,000 Toronto ON Negotiated
RETIREMENT RESIDENCE, COMMUNITY CENTRE
$45,500,000 Toronto ON Negotiated
$40,000,000 Brampton ON Prebid
| CURRENT STORIES |
- Carpenters’ union official Ucal Powell named to Order of Ontario
- Masonry contractor Limen Group suspends site work for safety training day
- What comes next after green building?
- London & District Construction Association to study information and communication
- Dessau acquires Halifax engineering firm Maritime Testing
- Nominations now open for Canadian Railway Hall of Fame
- $196 million in construction work for Churchill Corp.
- Town of Mount Royal, Quebec launches library expansion project
- Montreal firms submit proposals for fire station redevelopment
- Toronto employer fined over worker using metal pliers in electrical panel
- Alberta throne speech hints at development plan
- Union claims construction oversight needed at defence department
- North Vancouver condos are First Place
- $2 billion oilsands expansion gets the green light
- Whistler asphalt plant operator wins court battle
- Research council's web wind tool helps with roof design
- Exploring the Canadian identity
- Immigration stream would be welcome
- Saskatchewan mayors want cash
- Yukon's first LEED structure earns its certification
- Co-operation planned on codes and standards
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Home starts and job levels diverge in Canada and the U.S. (February 8, 2012)
- Canada’s labour market flat in January but U.S. on a roll (February 3, 2012)
- Canada’s leading indicator series continued to charge ahead in December (January 23, 2012)
- More








