January 24, 2008
In addition to steel planters, Covenant House’s roof garden has steel trellis framing because limited anchorage would have made the use of wood posts impractical.
Steel answers needs of green roof project at Toronto youth shelter
TORONTO
Covenant House, Canada’s largest shelter for homeless youth, offers a second chance to thousands of kids annually. Much more than a shelter, Covenant House provides young people with the tools to build independent lives including education, counseling, job training and vocational assistance.
Covenant House is now developing a plan to realize its dream of constructing a roof-top garden or green roof at its McGill Street site in downtown Toronto.
The firm of Read Jones Christoffersen Ltd. (RJC) was commissioned in April 2007 to investigate the structural potential of constructing a green roof on the existing roof. From approximately 1981, the building was a private women’s club. Architectural and structural drawings were available from that time which indicated the building also underwent major renovations. These renovations included the addition of the current fourth floor and roof levels on a previous three-storey building. The roof that was added at that time had been designed as a rooftop recreational area as opposed to strictly a roof. This included designing the steel roof structure for live loading in excess of Building Code snow load requirements.
Renovations in 2001-2002 removed the rooftop recreational facilities; consequently there remained reserve structural capacity in the existing steel framing. The roof structure is constructed of long-span open-web steel joists, which clear-spanned the entire 60-foot width of the building. This joist framing is overlain with concrete topping on steel roof decking. RJC’s investigations included review of the 1981 structural drawings, site measurements of steel joist properties and spans, as well as a subsequent numerical analysis to confirm the load-carrying capability of the roof structure. RJC concluded that there is reserve capacity of the steel structure to construct an “extensive” green roof, with a lightweight-growing medium. The original use of structural steel for this roof framing added to the flexibility of the use of this rooftop space, including the construction of the green roof.
Brian Roth, of Roth and Associates, designed the green roof for Covenant House and has made use of steel construction with the incorporation of Gotten steel planter boxes and a weathering steel water feature.
The texture and colour of the weathering steel is a significant addition to the landscape architect’s palette of natural materials used in this design. Roth has chosen steel for its durability and its adaptability because it lends itself perfectly for constructing the gently curving shapes of the planters and water feature. Additionally, steel HSS framing was used to create a free-standing trellis structure. Steel was chosen due to limited anchorage to the existing relatively thin concrete topping.
Timber post framing would have required moment-connected bases, which were impractical due to this limited anchorage. As well the presence of a drywall ceiling in the uppermost floor did not allow for a through-bolted attachment.
In addition to ornamental plants, the roof will have plots for vegetables, fruits and herbs, which can be used by the agency’s food services department or in youth cooking classes.
Reprinted with permission from the Canadian Insitute of Steel Construction.
| MOST POPULAR STORIES |
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 425 projects with a total value of $5,472,383,138 that Reed Construction Data Building Reports reported on Tuesday.
$660,000,000 Marmora and Lake Twp ON Prebid
$200,000,000 Kingston ON Prebid
$105,000,000 Oshawa ON Prebid
| CURRENT STORIES |
- Where does labour law stand on ladder safety?
- Construction continues on the MaRS Centre Phase II in Toronto
- Bending Lake Iron Ore pushes ahead with mining plans
- Reserve Properties continues plans for 109OZ condos in Toronto
- Ontario courts rule against owners rejecting low bids using undisclosed criteria
- Westray disaster 20th anniversary a call to safety action
- Dirt moves as Saskatchewan announces highway work
- Worker hurt in dressing room ceiling collapse at Edmonton stadium
- IBI Group raises $40.5 million from stock issue
- Plazacorp to spend $12.2 million on retail property development in 2012
- Ottawa to proceed with preliminary Lansdowne Park construction work, short-lists PCL, EllisDon and Pomerleau
- VIDEO: Highlights from the May 17 Daily Commercial News
- VIDEO: Common ladder safety errors in construction
- High School Construction
- Victoria bridge inches closer to construction
- Collapse injures worker at Commonwealth Stadium
- Panel appointed to oversee hearings into B.C. mine project
- Bockstael celebrates 100 years
- More work needed to protect flaggers
- Co-founder of ATCO announces his intention to step down as chair
- SNC-Lavalin hit with $1.5 billion class action lawsuit
- PST returns to British Columbia
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Economic Nuggets - May 15, 2012 (May 14, 2012)
- Canada Rode a Second Consecutive Month of Strong Job Gains in April (May 11, 2012)
- U.S. Employment Rose by a Mediocre 115,000 in April (May 4, 2012)
- More








