LATEST NEWS
O H & S
July 10, 2008
George Brown College to build campus on Toronto waterfront
George Brown College will build a new state-of-the art campus on the city’s lakefront, according to a statement made by Waterfront Toronto on July 8, 2008.
“The new campus will be a cornerstone of the East Bayfront community,” says Mark Wilson, Waterfront Toronto Chairman.
The new campus, slated to open in 2011, will house not only the college’s Centre for Health Sciences, but also its first student residences and a recreational complex.
The waterfront campus will be located on a 0.83 hectare (two-acre) parcel of land located on the south side of Queens Quay Boulevard, between Lower Jarvis and Lower Sherbourne Streets.
In the meantime, construction is well underway on Toronto Economic Development Corporation’s First Waterfront Place, the future home of Corus Entertainment Inc., which is also located in East Bayfront.
Next month, Waterfront Toronto cuts the ribbon on the new Spadina Head of Slip, and this fall infrastructure construction begins in East Bayfront. In 2009, construction begins on two showcase parks, Sherbourne Park and Sugar Beach, and on the new water’s edge promenade.
– RCD Digital Media
| MOST POPULAR STORIES |
- Video Editorial: U.S. trade deficit remains stuck at $700 billion
- Industry welcomes $1.1 billion investment in infrastructure by Ontario
- Brampton, Ontario mall project holds multiple challenges
- Oilsands equipment for Northern Alberta will move via Thunder Bay, Ontario
- Work proceeds at Shops At Don Mills
- 20 Most Popular Stories
| CURRENT STORIES |
- History plays a role in Niagara-on-the-Lake development
- Sawing at St. Gabriel Village in North York, Ontario
- A growing, green biodiesel option
- Guelph, Ontario firm fined $200,000 in worker's death
- Aecon wins $31.5 million Smiths Falls, Ontario hospital contract
- Video Editorial: U.S. trade deficit remains stuck at $700 billion
- Sky-high View in Vancouver
- Plutonic lands GE financial services as P3 partner in B.C. Hydro bid
- New Zealand industry finds estimators in short supply
- Rising temperatures damage infrastructure in Arctic communities
- U.S. resident dies in Alberta collision
- Quebec nuke plant to get $1.9 billion upgrade
- Ashbridges Bay Treatment Plant in Toronto set to upgrade odour control
- Cambridge, Ontario treatment plant gets $23 million upgrade
- Barrie, Ontario aggressively expands water and wastewater systems
- Small plant in Smith Falls, Ontario is big on unique features
- Moncton, New Brunswick set to replace Turtle Creek dam
- Keeping pace with community growth north of Toronto
- Overlapping phases provide cost-saving options in Leamington, Ontario project
- Montreal finalizing plans for $200 million plant using ozonation to treat wastewater
| ALEX’S BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in Canada's economic environment. He also shares light-hearted reflections on life and current events.
Economics Blog More 
- Upcoming Mega Industrial Construction Projects (August 29, 2008)
- Industrial Construction is Resource-related (August 28, 2008)
- Construction Starts are Down about One-quarter So Far this Year (August 22, 2008)
Lifestyle Blog More 
- What’s Red, Pretty and Prickly? (August 26, 2008)
- What’s Happened to Jokes Isn’t Funny (August 25, 2008)
| PROJECT NEWS BRIEFS |
Updates on Canadian construction projects from Reed Construction Data’s research team. More 
- Salter Pilon Architecture Inc. wins contract to design Bradford recreation centre (Aug 22, 2008)
- Shore Tilbe Irwin & Partners begin designs for LEED Silver-compliant community centre (Aug 22, 2008)
- Salter Pilon Architecture nears completion of Georgian Manor working drawings (Aug 22, 2008)
- Town of Markham proposes new LEED-compliant Cathedral Town firehall (Aug 22, 2008)
- Townline Group plans redevelopment of former Fantasy Garden World property (Aug 18, 2008)
