LATEST NEWS
Professional Services
July 22, 2008
U2 members and partners win battle over conversion of Dublin’s Clarence Hotel
DUBLIN
U2 stars Bono and The Edge won a four-year legal battle Thursday to reshape their old-fashioned Dublin hotel, the Clarence, into a futuristic landmark — a decision that appeared to fly in the face of Ireland’s conservative planning laws.
Ireland’s planning board approved a $235-million plan produced by British architect Lord Norman Foster to gut and drastically expand the riverside hotel. The new complex would more than triple the number of its rooms to 166 and would feature a massive, floodlit glass roof atrium — dubbed “the flying saucer.”
Bono, The Edge and their property developer partner, Paddy McKillen, said in a statement that the verdict was “great news for Dublin and for Temple Bar in particular.” Temple Bar is the neighbouring cobblestone-street tourist district packed with pubs and music.
Their myriad opponents said, however, that the decision demonstrated the exceptional political clout wielded by Dublin’s most famous musical sons.
“We would obviously condemn the decision. It undermines national legislation on architectural heritage because of the number of protected sites being demolished,” said Ian Lumley, an officer with An Taisce, Ireland’s heritage-protection organization.
Lumley said Foster’s grandiose design was “a very impressively conceived scheme but in the wrong place. This would not be allowed in areas of comparable sensitivity in any other European countries.”
The planning authority ordered the developers to preserve the facades of six buildings: the 1930s Art Deco original hotel and five other adjacent Georgian and Victorian properties being swallowed up by the future Clarence. It also ordered that an archeologist be on the construction site at all times.
In their judgment, the planning panel said Foster’s envisioned hotel “would provide a building of unique quality and architectural distinction at this quayside location” that would “in time become a significant feature in vistas along the Liffey (River) and would ensure the continued historic hotel use of a signature building.”
Conservationists had successfully blocked an earlier, even bigger design for the hotel’s redevelopment and fought the scaled-down Foster plans at Dublin City Council in 2007. The Irish government’s environment department also opposed the plans, as did a council-hired conservation architect, Claire Hogan.
“Dublin’s beauty as a capital and its claim to being one of the greatest of surviving Georgian cities depends on its whole fabric of streetscapes rather than a collection of resounding buildings — the quiet ease of understatement, something rarely found in Europe,” she wrote in her 2007 report, which the council overruled.
Bono, The Edge and U2’s other members — bassist Adam Clayton and drummer Larry Mullen — are among Ireland’s wealthiest residents. In 2006 the band moved its royalties-collection company to Amsterdam, Holland, to maintain the tax-free status of their music profits, even as they have continued to amass a property portfolio in their long-booming homeland.
A Foster-designed U2 Tower has also been approved by planning authorities to become Ireland’s tallest building. The planned 120-metre building is to be built by 2012 further east on the River Liffey waterfront in a run-down docklands area. U2’s new recording studios will be at the top.
Associated Press
| MOST POPULAR STORIES |
- Steel hurdles for Aga Khan Museum build
- Benson Steel faces transport challenge on Toronto Yorkdale Mall construction project
- York Region, Ontario approves subway construction expenditures
- Bidding closes for Toronto 2015 Pan Am games venues
- MOD Developments 60-storey Massey Tower to include restoration of 1905 Toronto bank
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 316 projects with a total value of $1,890,889,993 that Reed Construction Data Building Reports reported on Thursday.
$65,000,000 Toronto ON Negotiated
RETIREMENT RESIDENCE, COMMUNITY CENTRE
$45,500,000 Toronto ON Negotiated
$40,000,000 Brampton ON Prebid
| CURRENT STORIES |
- Carpenters’ union official Ucal Powell named to Order of Ontario
- Masonry contractor Limen Group suspends site work for safety training day
- What comes next after green building?
- London & District Construction Association to study information and communication
- Dessau acquires Halifax engineering firm Maritime Testing
- Nominations now open for Canadian Railway Hall of Fame
- $196 million in construction work for Churchill Corp.
- Town of Mount Royal, Quebec launches library expansion project
- Montreal firms submit proposals for fire station redevelopment
- Toronto employer fined over worker using metal pliers in electrical panel
- Alberta throne speech hints at development plan
- Union claims construction oversight needed at defence department
- North Vancouver condos are First Place
- $2 billion oilsands expansion gets the green light
- Whistler asphalt plant operator wins court battle
- Research council's web wind tool helps with roof design
- Exploring the Canadian identity
- Immigration stream would be welcome
- Saskatchewan mayors want cash
- Yukon's first LEED structure earns its certification
- Co-operation planned on codes and standards
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Home starts and job levels diverge in Canada and the U.S. (February 8, 2012)
- Canada’s labour market flat in January but U.S. on a roll (February 3, 2012)
- Canada’s leading indicator series continued to charge ahead in December (January 23, 2012)
- More








