LATEST NEWS
Green Building | Concrete | Skills Training | Trade Contracting
February 12, 2009
OUR COOL BLUE ARCHITECTS
Camp Kawartha’s environment centre on the grounds of Trent University received $100,000 from the Gainey Foundation toward building costs of approximately $185,000.
Green Building
Camp Kawartha Environment Centre in Lakefield, Ontario is sustainable building in action
Building itself serves as tool for teaching green principles
The new Camp Kawartha Environment Centre aims to be a groundbreaking environmental education facility for students, teachers and its builders all learning about sustainable buildings.
“The building itself becomes a teaching building and a practical tool for kids to feel, bear witness and see sustainable buildings in action,” said Jacob Rodenburg, executive director of Camp Kawartha. “We hope it will also serve as a model for other universities and plant the seed concerning sustainable buildings and living.”
The 2,000 square foot centre will be located on the Trent University grounds and will be built by students in Fleming College’s Sustainable Building Design and Construction certificate program. The Fleming students will design and build the new facility in partnership with Camp Kawartha.
The facility will be used by students from kindergarten to Grade Four and those in high school, with a maximum capacity for approximately 80 people. Its focus will be environmental programming showcasing sustainable living practices.
Construction is expected to begin in April and end by October of this year, running the length of Fleming’s sustainable construction certificate program. The centre recently received a $100,000 gift from the Gainey Foundation which it can put towards its estimated $185,000 building costs. When incorporating in-kind donations of labour and materials, along with a 21-year land lease with Trent University, the project is valued at approximately $500,000.
“We are proud to be a part of this strong community partnership and to help realize a unique and exciting environmental centre that will benefit and inspire children, educate and train future teachers and serve as an example as to how we can all live more sustainably,” said Bob Gainey of the Gainey Foundation in a statement.
Using innovative sustainable architecture techniques, the centre will consist of reclaimed and recyclable building materials, an earth-bag foundation, straw bale walls, solar power, a rainwater collection system, and composting toilets.
Chris Magwood, is co-ordinator of Fleming College’s Sustainable Building Design and Construction program and has helped deliver four examples of sustainable buildings through this one-of-a-kind hands-on course.
The most recent building was Madoc’s new performing arts centre built last year which was a net-zero building, a program first. Recyclable and sustainable materials were used throughout the structure. Square straw bales covered in a plaster mix of mud, clay and straw were used for the walls of the centre. Three different insulation types were used for the building’s three wings. One type is hempcrete, a site-mixed combination of ground hemp, water and hydrated lime.
The centre also has a geothermal heating and cooling system and electricity generated through a photovoltaic power system, where energy is collected through solar panels and stored in batteries.
Camp Kawartha is still looking for donations to cover construction costs and has started a “Buy a Bale” program. By purchasing one of the straw bales needed to construct the centre your name, or the name of your organization will be placed on a wall of recognition in the building. Donations are also eligible for a charitable tax receipt.
| MOST POPULAR STORIES |
- How to suspend a 13-storey tower over a century-old four-storey structure
- Toronto Maple Leaf Gardens time capsule included construction details of arena
- Caterpillar dispute a factor in CAW-CEP union merger talks
- Harley Davidson to roar into Quebec, with $15-million franchise headquarters under construction
- Future unclear for price of iron ore, scrap steel, rebar
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 333 projects with a total value of $7,273,203,495 that Reed Construction Data Building Reports reported on Thursday.
STADIUM, BERMS, PARKING GARAGE, SITE WORKS
$129,300,000 Ottawa ON Tenders
$80,000,000 North York ON Tenders
CONDOMINIUM APARTMENT BUILDING, RETAIL
$75,000,000 Toronto ON Prebid
| CURRENT STORIES |
- Ontario Road Builders’ Association focused on partnerships at convention
- Construction continues on the Regent Park Aquatic Centre in Toronto
- BML Multi Trades president Jim DiNovo takes helm of Hamilton-Halton Construction Association
- Seeing the sustainable forest for the trees
- Steel hurdles for Aga Khan Museum build
- Milton, Ontario council approves velodrome for 2015 Pan Am games
- ASHRAE, International Association of Plumbing and Mechanical Officials plan to cooperate on codes, standards
- MOD Developments 60-storey Massey Tower to include restoration of 1905 Toronto bank
- ERA Architects to conduct study for possible heritage district in Picton, Ontario
- Burlington, Ontario announces preferred hospital redevelopment site
- Bing Thom Architects to design Surrey Performing Arts Centre
- Wind farm contract awarded
- Opposition grows after deal collapses
- $1.8 billion in improvements planned for Vancouver airport
- When low bidders sue over contracts
- North Vancouver condos take shape
- U.S. firms expect fewer layoffs in 2012
- Maple Leaf Gardens time capsule discovered
- A look at Canada's historic concrete ship
- Partnership announced between File Hills Qu'Appelle Tribal Council and Graham Business Trust
- Mike Holmes-designed community in Alberta gets go ahead
- Province of British Columbia contributes cash to green energy projects
- Program for upcoming apprenticeship forum released
- New VRCA chair elected
- Construction union wage index remains the same
- Alberta government orders immediate site remediation
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Canada’s leading indicator series continued to charge ahead in December (January 23, 2012)
- 2012 holds promise but there’s no denying the uncertainty (part 2) (January 12, 2012)
- 2012 holds promise but there’s no denying the uncertainty (part 1) (January 11, 2012)
- More








