LATEST NEWS
O H & S | Trade Contracting | Professional Services | Skills Training
May 22, 2009
SALISBURY BY HONEYWELL
Use of Arc Rated Flame Resistant clothing and personal protective equipment is being adopted as policy by companies that are using CSA-Z462, a new electrical safety best practices guide.
Safety Regulation
CSA electrical standard an aid to new safety code
In January, the Canadian Standards Association released CSA-Z462, a voluntary best practices guideline that represents the country’s first national workplace electrical safety standard. However, there’s some uncertainty among Ontario’s electrical contractors as to what role the standard will play in daily working life.
Part of the confusion may have to do with the 2009 Ontario Electrical Safety Code, which took effect on May 1, convincing some contractors that the CSA standard has become law.
“Electrical safety is covered in Ontario’s Occupational Health and Safety Act, but the CSA standard doesn’t replace that legislation,” says Len Cicero, an executive member of the CSA-Z462 Technical Committee, and president of Lenco Training & Technical Services of Burlington, Ont.. “It’s a best practices guide and a supporting document that tells you how to get into compliance with the legislation.”
Some contractors may also believe that the CSA standard applies only to electrical workers. Instead, it applies to any worker potentially at hazard for working in proximity to electrical equipment, including HVAC personnel, millwrights, engineers or even project staff.
“Bottom line is, the standard applies if the door is open on a control panel or the cover is off a distribution panel, and the power is on, or if someone is verifying power is off with an electrical tester,” says Cicero.
So what power does CSA-Z462 currently have?
The existence of the standard itself can impose duty of care obligations on employers.
“If something happens that could have been prevented by adhering to the standard, a company can be held accountable,” says Cicero.
In other cases, larger companies are adopting the CSA standard as company policy and requiring the same of smaller contractors who want to work for them.
Contractors who adopt the policy are required to provide workers with Arc Rated Flame Resistant (FR) clothing and personal protective equipment (PPE) when they work on energized electrical systems.
Electrical contractors may be required to work on energized systems while performing diagnostic work, or while troubleshooting problems as a new system is energized.
“Current regulations already state that employers must protect workers from electrical shock and burns,” says Cicero. “The CSA standard specifically addresses both electrical shock and arc flash hazards.”
Cicero stresses that this does not mean that workers will have to wear complete arc flash suits all of the time.
“This is the type of PPE consisting of complete FR clothing and an equipment system that covers the entire body except for the hands and feet — pants, jacket, and a beekeeper-type hood fitted with a face shield,” he says.
These suits vary greatly in price depending on size and calorie rating, says Lisa Nicodemo, with the Sales and Marketing department of Lineman’s Testing Laboratories, a Toronto-based supplier of electrical safety equipment.
A suit consisting of a jacket, bib, overalls and hood, for example, can range from about $900 to $1,500.
“An example of a good, inexpensive solution is what is referred to as the simplified HRC (Hazard Risk Category) 2 daily wear to be worn by workers for their entire shift,” says Cicero.
“This may consist of a combination FR shirt and pant, or coverall which is generally more than adequate protection for 80 to 90 per cent of regular tasks.”
Al Gordon, President of Gordon Electric in London, Ont. and President of the Electrical Contractors Association of London says that his workers have been equipped with the suits, but notes that smaller contractors are reluctant to buy them, due to the initial capital outlay.
“The full FR suits are difficult to move around in and you look like you’re from outer space while wearing them,” he says.
“But contractors are becoming aware that if you don’t wear them now that the standard has described their use, you could be charged.”
| MOST POPULAR STORIES |
- Construction moving forward on Ho Chi Minh City tunnel
- Deaths of five immigrant workers changed jobsites forever
- Pride, sadness as Hogg's Hollow memorial unveiled
- St. Marys Cement plant workers go on strike in Bowmanville, Ontario
- ‘Sandhogs’ who perished had diverse personal stories
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 371 projects with a total value of $1,380,346,147 that Reed Construction Data Building Reports reported on yesterday.
MINE, PROCESSING PLANT, TREATMENT BLDGS
$50,000,000 Cochrane Dist ON Prebid
CONDO APARTMENT BLDG, COMMERCIAL OFFICE, RETAIL
$50,000,000 Toronto ON Prebid
EDUCATION BUILDINGS, ADDN ALTS
$40,000,000 Toronto ON Prebid
| CURRENT STORIES |
- Construction Sector Council’s firm-capacity survey to identify challenges
- Pride, sadness as Hogg's Hollow memorial unveiled
- Commemorative quilt gets permanent home
- Getting a lift at iLoft condos in Toronto
- ‘Sandhogs’ who perished had diverse personal stories
- Construction Safety Association of Ontario saluted for pioneering role in provincial health and safety
- Work continues on Mona Lisa Residences in North York, Ontario
- Association of Consulting Engineering Companies campaign targets students
- China to bid on U.S. high-speed rail projects
- Northern Ontario First Nations demand consultation on chromite mining
- Filling labour gap a top priority for incoming Canadian Construction Association chair
- Safety issues raised as Vancouver hires chief electrical inspector
- Buildex Edmonton seminar to examine worksite safety on green building projects
- Canadian Construction Association awards highlight excellence
- Chilliwack Cultural Centre project sets tilt-up concrete record
- Imperial Oil choses Finning International as mining equipment supplier for oilsands project
- BC Hydro awards purchase agreements for 19 clean wind, run-of-river energy projects
- Ledcor continues construction on mixed-use project in Vancouver
- Role of general contractor has evolved over the years
- Alberta Pipe Trades College ready to open the valve on training
- Friction grows between generals and trades during recent downturn
- Green building adding to administrative burden for contractors
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Sub-sector investment spending intentions from Statistics Canada’s latest survey (March 17, 2010)
- A dozen incredible measurement sets on Canada’s changing ethnic mix (March 9, 2010)
- How fragile is recovery around the world? (March 3, 2010)
- More







