November 10, 2009
MICHAEL DESJARDINS
Military officials and members of the public gathered Nov. 7 for the rededication ceremonies of the All Sappers’ Memorial in Chilliwack, British Columbia.
All Sappers Memorial rededicated to combat engineers in Chiliwack, British Columbia
CHILLIWACK, B.C.
The All Sappers Memorial in Chilliwack, B.C. has received a $1 million facelift and was rededicated last weekend to all Canadian military combat engineers who have laid down their lives for their country.
“Military engineers are present everywhere the Canadian Forces go; building defence infrastructure, roads and waterways, and disarming IEDs (improvised explosive devices),” said Peter MacKay, Minister of National Defence. “The All Sappers Memorial is a truly fitting memorial that recognizes the work, dedication and sacrifices of Canada’s military engineers.”
“The work of Canada’s military engineers in the spring flood of 1948 is the stuff of legend,” said Chuck Strahl, MP for Chilliwack-Fraser Canyon. “It is only natural that our community would want to recognize their heroism and sacrifice by rededicating the All Sappers Memorial.”
• Dahla Dam restoration the centrepiece of Afghanistan reconstruction
• In Afghanistan, Canadian Forces engineers face the ultimate danger
Lieutenant-Colonel Coulson Norman Mitchell, VC, MC, RCE, Commander of Camp Chilliwack at the time, oversaw the original design and the construction of the park. The monument, which was originally unveiled by the Governor General Sir Harold Alexander, Field Marshal the Earl Alexander of Tunis, on July 14, 1946, is made of granite and weighs 42 tonnes. It was quarried by the Royal Canadian Engineers at nearby Harrison Lake, B.C., and transported to Chilliwack for cutting into the monument present today.
Canada Lands Company (CLC) Limited has been the custodian of the All Sappers Memorial since the closure of Canadian Forces Base Chilliwack in 1998. CLC has made a planned investment of close to $1-million to revitalize the memorial and enhance the surrounding grounds. The site will be turned over to the City of Chilliwack to be maintained in perpetuity as the All Sappers Memorial Park.
DCN News Services
| MOST POPULAR STORIES |
- How to suspend a 13-storey tower over a century-old four-storey structure
- Toronto Maple Leaf Gardens time capsule included construction details of arena
- Caterpillar dispute a factor in CAW-CEP union merger talks
- Harley Davidson to roar into Quebec, with $15-million franchise headquarters under construction
- Future unclear for price of iron ore, scrap steel, rebar
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 333 projects with a total value of $7,273,203,495 that Reed Construction Data Building Reports reported on Thursday.
STADIUM, BERMS, PARKING GARAGE, SITE WORKS
$129,300,000 Ottawa ON Tenders
$80,000,000 North York ON Tenders
CONDOMINIUM APARTMENT BUILDING, RETAIL
$75,000,000 Toronto ON Prebid
| CURRENT STORIES |
- Ontario Road Builders’ Association focused on partnerships at convention
- Construction continues on the Regent Park Aquatic Centre in Toronto
- BML Multi Trades president Jim DiNovo takes helm of Hamilton-Halton Construction Association
- Seeing the sustainable forest for the trees
- Steel hurdles for Aga Khan Museum build
- Milton, Ontario council approves velodrome for 2015 Pan Am games
- ASHRAE, International Association of Plumbing and Mechanical Officials plan to cooperate on codes, standards
- MOD Developments 60-storey Massey Tower to include restoration of 1905 Toronto bank
- ERA Architects to conduct study for possible heritage district in Picton, Ontario
- Burlington, Ontario announces preferred hospital redevelopment site
- Bing Thom Architects to design Surrey Performing Arts Centre
- Wind farm contract awarded
- Opposition grows after deal collapses
- $1.8 billion in improvements planned for Vancouver airport
- When low bidders sue over contracts
- North Vancouver condos take shape
- U.S. firms expect fewer layoffs in 2012
- Maple Leaf Gardens time capsule discovered
- A look at Canada's historic concrete ship
- Partnership announced between File Hills Qu'Appelle Tribal Council and Graham Business Trust
- Mike Holmes-designed community in Alberta gets go ahead
- Province of British Columbia contributes cash to green energy projects
- Program for upcoming apprenticeship forum released
- New VRCA chair elected
- Construction union wage index remains the same
- Alberta government orders immediate site remediation
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Canada’s leading indicator series continued to charge ahead in December (January 23, 2012)
- 2012 holds promise but there’s no denying the uncertainty (part 2) (January 12, 2012)
- 2012 holds promise but there’s no denying the uncertainty (part 1) (January 11, 2012)
- More








