LATEST NEWS
Trade Contracting | O H & S | Professional Services | Concrete
January 8, 2010
Swing-stage tragedy hits home for Labourers' International Union of North America
'If there is a fault with this thing, I want to find out,' director says
With hundreds of its workers on swing stages daily, one of North America’s largest unions has numerous concerns about the Christmas Eve incident that claimed four worker lives in Toronto.
“Whether it is a union or non-union site, we are concerned because it is about protecting our own members,” says Cosmo Mannella, director, health and safety, Labourers' International Union of North America (LIUNA).
“ Let’s take this particular swing stage: how do I know that I do not have a hundred of our members, on any given day, standing on this type of swing stage. If there is a fault with this thing, I want to find out.”
Related:
Ontario labour ministry to conduct inspection blitz of scaffolds
Trust fund established to help families of swing stage accident victims
Swing stage collapse underscores urgent need to share information
Ontario Federation of Labour president calls for criminal investigation into Christmas Eve deaths
On the afternoon of Dec. 24, four construction workers plunged 13 storeys to their deaths at a Kipling Avenue apartment restoration work site when a swing stage they were working on came apart.
The accident killed Aleksey Blumberg, Fayzullo Fazilov, Alexander Bondorev and Vladimir Korostin. A fifth worker, Dilshod Marupov, of Uzbekistan, remains in critical care in hospital after surviving the fall. The Ontario Ministry of Labour has stated that the accident was a complex one and the investigation is ongoing.
The type of swing stage involved in the incident, its capacity and load, proper worker instruction and the wind conditions at the time of the accident, are among the questions LIUNA has about the incident.
The restoration industry has become lucrative over the last five years because there are so many apartments buildings, garage and similar structures built 25 to 35 years ago that now need work, Mannella adds.
Frank Cassano, agent, Ontario Provincial Council , LIUNA, says that in his experience with the restoration industry, highly skilled undocumented workers are being taken advantage of on many jobs.
“The restoration industry is a very highly skilled industry. The four or five guys at such projects have to be really good.
“The project may need them to conduct a variety of duties from the chipping and the grinding to cement finishing and formwork,” says Cassano.
“Also, they are generally grossly underpaid. This is highly skilled labour and dangerous work and a lot of companies get around that by fudging work classification under the Workplace Safety and Insurance Board.”
Over the past four years LIUNA has lobbied the federal government to try and normalize the existing non-documented labour force.
The union still points to a proposal it made two years ago to the federal government designed to stem the deportation of construction workers who do not have permanent residence status.
| MOST POPULAR STORIES |
- Steel hurdles for Aga Khan Museum build
- Benson Steel faces transport challenge on Toronto Yorkdale Mall construction project
- Toronto Construction Association presents ‘Best of the Best’ awards
- Bidding closes for Toronto 2015 Pan Am games venues
- What comes next after green building?
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 288 projects with a total value of $2,181,603,356 that Reed Construction Data Building Reports reported on Friday.
STADIUM, BERMS, PARKING GARAGE, SITE WORKS
$129,300,000 Ottawa ON Tenders
$107,557,000 Burlington ON Tenders
CONDOMINIUM APARTMENT BUILDING
$31,300,000 Toronto ON Prebid
| CURRENT STORIES |
- Steel truss system helps reduce construction cost of Toronto apartment building
- Ontario College of Trades will drive up infrastructure costs: Conservative leader Tim Hudak
- Procurement needs to be fair, open and transparent
- Losing bidder bridles at Pan Am Games park selection, Equine Canada “thrilled”
- Armstrong extended at Ontario College of Trades
- CVTech secures Hydro Quebec construction, maintenance work
- Toronto council votes in favour of light rail transit
- Ottawa City Council approves affordable housing capital projects
- Pre-cast concrete segment falls into river after gantry crane collapses
- Alberta throne speech hints at development plan
- Union claims construction oversight needed at defence department
- Site prep in North Vancouver
- Legislation limiting strikes ruled unconstitutional
- World Plumbing Day garners support from Canadian senator
- PHOTO GALLERY: Merit Alberta open house
- Seeing the sustainable forest for the trees
- Pump Station Upgrades
- Labour federation opposes pipeline
- Site for new correctional facility selected
- Edmonton roofer dies
- Regulators approve oilsands facility expansion
- Highway 3 upgrades
- New chairman named for Alberta Construction Association
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Home starts and job levels diverge in Canada and the U.S. (February 8, 2012)
- Canada’s labour market flat in January but U.S. on a roll (February 3, 2012)
- Canada’s leading indicator series continued to charge ahead in December (January 23, 2012)
- More








