LATEST NEWS
Green Building | Water & Wastewater | Sewer & Watermain | Concrete | Roadbuilding
January 13, 2010
Tender calls expected soon for Osoyoos band’s industrial park expansion
VANCOUVER
Ground-breaking on the second phase of the Oliver, British Columbia-based Senkulmen Enterprise Park is slated for early 2010 after the project received a $2.7-million federal government grant.
“We are looking to have shovels in the ground (this month)” said Chris Scott, chief operating officer for the Osoyoos Indian Band Development Corporation.
Tender calls are expected to go out shortly through a construction management firm, which has been chosen, but not yet ratified by the band council.
The name of the company is not being disclosed until approved. True Consulting Group, out of Kamloops, did the initial engineering on the 207-acre development, which is expected to include five or more new phases at build-out.
The commercial and light industrial development, located at the north end of the Osoyoos Indian Band reserve on Highway 97 near Oliver, will stress stringent sustainable guidelines for building design, infrastructure and area development.
“Our goal is to deliver one of the most environmentally sustainable industrial and commercial park developments in Canada,” said band Chief Clarence Louie.
The band first attempted to develop the area into a business and commercial park about 40 years ago, but approvals weren’t received.
Brights Winery (now Constellation Brands) is the band’s main tenant in the first phase of the park. The winery has since expanded to more than 18 acres, employs 160 people and has a quarter of a million square feet under roof.
The success made the band want to attempt to move forward with a second phase development.
“This (winery) really represented the type of blue-chip member we were looking for in the development of the park,” said Scott.
The latest park development is expected to translate into not only construction jobs for local First Nations, but also long-term jobs for local residents.
The band’s development company also has a number of existing businesses including NK’MIP Construction plus Oliver Readi-Mix, which opened on the reserve in 2002. It supplies concrete and aggregate, plus forms, accessories and pre-cast products to jobs in the South Okanagan.
Four years ago, the effort to kick-start the enterprise park began in earnest.
“There are 207 acres within the park, of which 112 acres are destined for development, with 72 forming a habitat area and wetlands, while the remaining land is a utility corridor.
Integral to the over-all project design to reduce impact on the environment, the park also features a residential area.
Green features are being used throughout the development.
Solar energy is being used for park lighting. A wastewater treatment system, by ECOfluid Systems Inc. of Burnaby, features an Upflow Sludge Blank Filtration (USBF) that provides a high treatment efficiency and includes biological nitrogen and phosphorous reduction.
Treated water is then purged further through the wetlands, which acts as a natural bio-filter.
A sanitary treatment plant will also feature a green roof and grey-water recycling will fufil irrigation needs.
Other features include: a district heat system using waste heat from the nearby winery; use of geothermal heat and cooling; and native plants for landscaping.
“In January, we want to start putting in the road, sewer and water and we hope we are ready to start construction in June 2010,” he said, adding the corporation is looking at an absorption rate of five to eight acres a year.
Complete build-out of the park is estimated to take 20 years and will include a total of 40 tenants.
| MOST POPULAR STORIES |
- Where does labour law stand on ladder safety?
- PCL Constructors works on Humber River Regional Hospital in Toronto
- Stakeholders react to Ontario College of Trades proposed membership fees
- Disclosure bill an attack on unions, says organized labour
- EllisDon to build performing arts centre for Queen’s University in Kingston, Ontario
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 267 projects with a total value of $4,935,993,413 that Reed Construction Data Building Reports reported on Friday.
LIGHT RAIL TRANSIT EXPANSION, STATIONS
$2,200,000,000 Toronto ON Prebid
$47,902,962 Clarington ON Tenders
$40,000,000 North York ON Negotiated
| CURRENT STORIES |
- EllisDon to build performing arts centre for Queen’s University in Kingston, Ontario
- Historic Burlington, Ontario railway station to be moved
- Widespread opposition to Ontario College of Trades membership classes
- Safety training today builds safety leaders of the future, says IHSA
- Denis Dixon new Professional Engineers Ontario president
- University of Windsor design competition winners announced
- Construction material costs “took a breather” in April: Associated General Contractors of America
- Almost fit for a King
- Contractors warned about PST transition
- Fort McMurray aggregate producer expands to meet demand
- Another multi-billion dollar LNG terminal proposed for Kitimat
- Best open shop contractors honoured
- Learning to dig safely in B.C.
- Review of Saskatchewan labour laws concerns unions
- Big deal for Ritchie Bros.
- Contracts awarded for 17 Wing in Winnipeg
- Highway 3 improvement contracts awarded
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Economic Nuggets - May 15, 2012 (May 14, 2012)
- Canada Rode a Second Consecutive Month of Strong Job Gains in April (May 11, 2012)
- U.S. Employment Rose by a Mediocre 115,000 in April (May 4, 2012)
- More








