LATEST NEWS
Green Building | Concrete | Building Envelope | Trade Contracting | Sewer & Watermain
January 21, 2010
Portland plans world’s most extensive vertical gardens
PORTLAND, Ore.
They haven’t figured out yet how to get the pruning done, but architects and federal officials plan one of the world’s most extensive vertical gardens in downtown Portland — what amounts to a series of 250-foot (76-metre)-tall trellises designed to shade the west side of an 18-story office building.
It is not a new idea to use greenery vertically as “living architecture,” running plants up the sides of a building to keep it cool.
But even in a city with a reputation for rainfed greenery as well as for green architecture, the wall of the Edith Green-Wendell Wyatt Federal Building would stand out.
The architects’ plans call for seven vertical “vegetated fins” to jut at acute angles. The fins would be the metal framework for planters and the greenery sprouting from them.
The west wall is 150 feet (46 metres) long, making the expanse to be shaded about three-quarters the size of a football field, minus the end zones.
The work is part of a US$135 million remodeling, with most of the money from federal stimulus funds. It is the largest single stimulus project announced so far in Oregon. The U.S. General Services Administration says its goal is to create a “landmark high-performance building.”
Eggleston’s firm, SERA Architects, is working on some questions that weekend gardeners never have to figure out: what plants will grow readily at more than 200 feet (61 metres) in the air and how to water, fertilize, weed and prune at that height.
The pruning might be done in much the same way windows are washed, he said, with workers hoisted and lowered on platforms.
Rainwater collected on the roof, supplemented by city water, will be piped for irrigating the green wall, he said.
The building is a modernist, International style high-rise completed in 1975 and named for two U.S. representatives from northwest Oregon.
Across a city park, it is face to face with City Hall.
It hasn’t gotten a great deal of respect in Portland. Bart King, author of a local guidebook to the city’s architecture, said he found it ugly and boring, so he didn’t include it.
It hasn’t aged well, either. Its precast concrete facade has settled, opening gaps around its single-pane windows, and it’s leaking air and water, said Kevin Kampschroer, the General Services Administration official in charge of the greening of the federal buildings.
So, off will come the facade, and out will come some of the building’s guts.
Construction is expected to take 30 to 40 months. Federal workers are beginning to move to temporary quarters.
The General Services Administration, landlord for federal office buildings, lists other energy-efficient features: Elevators that generate electricity on the way down, solar arrays on the roof, smart lighting systems that adjust to the daylight available, using some of the collected rainwater to flush toilets.
Associated Press
| MOST POPULAR STORIES |
- Where does labour law stand on ladder safety?
- PCL Constructors works on Humber River Regional Hospital in Toronto
- Stakeholders react to Ontario College of Trades proposed membership fees
- Disclosure bill an attack on unions, says organized labour
- EllisDon to build performing arts centre for Queen’s University in Kingston, Ontario
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 267 projects with a total value of $4,935,993,413 that Reed Construction Data Building Reports reported on Friday.
LIGHT RAIL TRANSIT EXPANSION, STATIONS
$2,200,000,000 Toronto ON Prebid
$47,902,962 Clarington ON Tenders
$40,000,000 North York ON Negotiated
| CURRENT STORIES |
- EllisDon to build performing arts centre for Queen’s University in Kingston, Ontario
- Historic Burlington, Ontario railway station to be moved
- Widespread opposition to Ontario College of Trades membership classes
- Safety training today builds safety leaders of the future, says IHSA
- Denis Dixon new Professional Engineers Ontario president
- University of Windsor design competition winners announced
- Construction material costs “took a breather” in April: Associated General Contractors of America
- Almost fit for a King
- Contractors warned about PST transition
- Fort McMurray aggregate producer expands to meet demand
- Another multi-billion dollar LNG terminal proposed for Kitimat
- Best open shop contractors honoured
- Learning to dig safely in B.C.
- Review of Saskatchewan labour laws concerns unions
- Big deal for Ritchie Bros.
- Contracts awarded for 17 Wing in Winnipeg
- Highway 3 improvement contracts awarded
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Economic Nuggets - May 15, 2012 (May 14, 2012)
- Canada Rode a Second Consecutive Month of Strong Job Gains in April (May 11, 2012)
- U.S. Employment Rose by a Mediocre 115,000 in April (May 4, 2012)
- More








