LATEST NEWS
Green Building | Concrete | Building Envelope | Trade Contracting | Sewer & Watermain
January 21, 2010
Portland plans world’s most extensive vertical gardens
PORTLAND, Ore.
They haven’t figured out yet how to get the pruning done, but architects and federal officials plan one of the world’s most extensive vertical gardens in downtown Portland — what amounts to a series of 250-foot (76-metre)-tall trellises designed to shade the west side of an 18-story office building.
It is not a new idea to use greenery vertically as “living architecture,” running plants up the sides of a building to keep it cool.
But even in a city with a reputation for rainfed greenery as well as for green architecture, the wall of the Edith Green-Wendell Wyatt Federal Building would stand out.
The architects’ plans call for seven vertical “vegetated fins” to jut at acute angles. The fins would be the metal framework for planters and the greenery sprouting from them.
The west wall is 150 feet (46 metres) long, making the expanse to be shaded about three-quarters the size of a football field, minus the end zones.
The work is part of a US$135 million remodeling, with most of the money from federal stimulus funds. It is the largest single stimulus project announced so far in Oregon. The U.S. General Services Administration says its goal is to create a “landmark high-performance building.”
Eggleston’s firm, SERA Architects, is working on some questions that weekend gardeners never have to figure out: what plants will grow readily at more than 200 feet (61 metres) in the air and how to water, fertilize, weed and prune at that height.
The pruning might be done in much the same way windows are washed, he said, with workers hoisted and lowered on platforms.
Rainwater collected on the roof, supplemented by city water, will be piped for irrigating the green wall, he said.
The building is a modernist, International style high-rise completed in 1975 and named for two U.S. representatives from northwest Oregon.
Across a city park, it is face to face with City Hall.
It hasn’t gotten a great deal of respect in Portland. Bart King, author of a local guidebook to the city’s architecture, said he found it ugly and boring, so he didn’t include it.
It hasn’t aged well, either. Its precast concrete facade has settled, opening gaps around its single-pane windows, and it’s leaking air and water, said Kevin Kampschroer, the General Services Administration official in charge of the greening of the federal buildings.
So, off will come the facade, and out will come some of the building’s guts.
Construction is expected to take 30 to 40 months. Federal workers are beginning to move to temporary quarters.
The General Services Administration, landlord for federal office buildings, lists other energy-efficient features: Elevators that generate electricity on the way down, solar arrays on the roof, smart lighting systems that adjust to the daylight available, using some of the collected rainwater to flush toilets.
Associated Press
| MOST POPULAR STORIES |
- Steel hurdles for Aga Khan Museum build
- Benson Steel faces transport challenge on Toronto Yorkdale Mall construction project
- Toronto Construction Association presents ‘Best of the Best’ awards
- Bidding closes for Toronto 2015 Pan Am games venues
- Steel key for CF-5 fighter jet monument at Toronto defence facility
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 288 projects with a total value of $2,181,603,356 that Reed Construction Data Building Reports reported on Friday.
STADIUM, BERMS, PARKING GARAGE, SITE WORKS
$129,300,000 Ottawa ON Tenders
$107,557,000 Burlington ON Tenders
CONDOMINIUM APARTMENT BUILDING
$31,300,000 Toronto ON Prebid
| CURRENT STORIES |
- Steel truss system helps reduce construction cost of Toronto apartment building
- Ontario College of Trades will drive up infrastructure costs: Conservative leader Tim Hudak
- Procurement needs to be fair, open and transparent
- Losing bidder bridles at Pan Am Games park selection, Equine Canada “thrilled”
- Armstrong extended at Ontario College of Trades
- CVTech secures Hydro Quebec construction, maintenance work
- Toronto council votes in favour of light rail transit
- Ottawa City Council approves affordable housing capital projects
- Pre-cast concrete segment falls into river after gantry crane collapses
- Alberta throne speech hints at development plan
- Union claims construction oversight needed at defence department
- Site prep in North Vancouver
- Legislation limiting strikes ruled unconstitutional
- World Plumbing Day garners support from Canadian senator
- PHOTO GALLERY: Merit Alberta open house
- Seeing the sustainable forest for the trees
- Pump Station Upgrades
- Labour federation opposes pipeline
- Site for new correctional facility selected
- Edmonton roofer dies
- Regulators approve oilsands facility expansion
- Highway 3 upgrades
- New chairman named for Alberta Construction Association
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Home starts and job levels diverge in Canada and the U.S. (February 8, 2012)
- Canada’s labour market flat in January but U.S. on a roll (February 3, 2012)
- Canada’s leading indicator series continued to charge ahead in December (January 23, 2012)
- More








