March 16, 2010
EllisDon CEO: Maybe it doesn't take brains to be smart
The following is a post from the blog of EllisDon CEO Geoff Smith:
I’m always impressed that most people have thought seriously about what it takes to be successful, in business and in life. It’s terrific that there are has so many individuals who look in the mirror and ... think.
Geoff Smith
Everyone has their own list, and one criterion is usually present: in order to be really successful, you have to be pretty smart. That is, it’s hard to be a huge success if you are, you know, dumb.
Now I’m thinking that notion itself might be dumb. I see really smart people do stupid things all the time. It dumbfounds me.
I’m going to suggest they do these things for one reason: they lack the courage of their beliefs, the guts to stand up. They don’t want to stand alone. They know what they think and believe, but their friendships and their status, and their desire to avoid confrontation, matter more.
I have been reading and thinking about people who have inspired me. If you are a ‘boomer’, you might agree that Pierre Trudeau was really smart, but mostly he was principled and fearless.
Also that Ronald Reagan wasn’t perhaps so brilliant, but was clearly both principled and courageous. Both had detractors and supporters, both were giants.
Perhaps it doesn’t take brains to be really smart. Perhaps it takes guts, the simple determination to stand up for what you believe is right, to make the tough call, regardless of what anyone else thinks; or the short term stress.
Just a thought.
| MOST POPULAR STORIES |
- Steel hurdles for Aga Khan Museum build
- Benson Steel faces transport challenge on Toronto Yorkdale Mall construction project
- Toronto Construction Association presents ‘Best of the Best’ awards
- Bidding closes for Toronto 2015 Pan Am games venues
- Steel key for CF-5 fighter jet monument at Toronto defence facility
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 288 projects with a total value of $2,181,603,356 that Reed Construction Data Building Reports reported on Friday.
STADIUM, BERMS, PARKING GARAGE, SITE WORKS
$129,300,000 Ottawa ON Tenders
$107,557,000 Burlington ON Tenders
CONDOMINIUM APARTMENT BUILDING
$31,300,000 Toronto ON Prebid
| CURRENT STORIES |
- Steel truss system helps reduce construction cost of Toronto apartment building
- Ontario College of Trades will drive up infrastructure costs: Conservative leader Tim Hudak
- Procurement needs to be fair, open and transparent
- Losing bidder bridles at Pan Am Games park selection, Equine Canada “thrilled”
- Armstrong extended at Ontario College of Trades
- CVTech secures Hydro Quebec construction, maintenance work
- Toronto council votes in favour of light rail transit
- Ottawa City Council approves affordable housing capital projects
- Pre-cast concrete segment falls into river after gantry crane collapses
- Alberta throne speech hints at development plan
- Union claims construction oversight needed at defence department
- Site prep in North Vancouver
- Legislation limiting strikes ruled unconstitutional
- World Plumbing Day garners support from Canadian senator
- PHOTO GALLERY: Merit Alberta open house
- Seeing the sustainable forest for the trees
- Pump Station Upgrades
- Labour federation opposes pipeline
- Site for new correctional facility selected
- Edmonton roofer dies
- Regulators approve oilsands facility expansion
- Highway 3 upgrades
- New chairman named for Alberta Construction Association
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Home starts and job levels diverge in Canada and the U.S. (February 8, 2012)
- Canada’s labour market flat in January but U.S. on a roll (February 3, 2012)
- Canada’s leading indicator series continued to charge ahead in December (January 23, 2012)
- More








