LATEST NEWS
July 30, 2010
Stimulus spending on U.S. national parks a major job creator
YELLOWSTONE NATIONAL PARK, Wyo.
Hundreds of stimulus-funded projects under way in national parks across the U.S. are long-overdue upgrades to the country’s neglected “national jewels,” vice-president Joe Biden said recently.
Biden held a two-day tour highlighting Recovery Act projects in Yellowstone and Grand Canyon national parks by speaking to about 100 park workers, contractors and their families in the scenic Madison Valley, where the famous Madison River is formed in the shadow of 7,500-foot National Park Mountain.
He said some US$750 million in stimulus money has gone to about 800 national park projects, which have created jobs in tough times. But, he added, the projects would have been necessary even if the economy was good to protect the parks and reduce man’s footprint there.
“For too long our nation’s crown jewels have been neglected,” Biden said. “Everything we’re doing in this park is worthwhile and needed to be done anyway, whether times were good or bad.”
So when the Recovery Act was passed in an effort to stabilize the economy, it included hundreds of national park upgrades and repairs that had been delayed or stalled, he said.
As part of his tour with Jon Jarvis, head of the National Park Service, Biden stopped at one of the projects nearby, a $4.7 million replacement of the 50-year-old Madison Wastewater Treatment Plant, which park workers say has contaminated the environment and degraded the Madison River’s water quality.
The new plant will be more than double the capacity of the old and will work more efficiently, Biden said. It is an example of how the projects are supposed to reduce the human impacts so that future generations will also be inspired by the parks, he said.
There are 14 different stimulus-funded projects worth $12.4 million under way or completed in Yellowstone, according to park officials.
Among them are installation of a new hydroelectric generation plant near Mammoth Hot Springs, which would reduce annual greenhouse gas emissions and save the park $80,000 a year in electricity bills; demolition and replacement of substandard trailers used for National Park Service employee housing; upgrades to the South Entrance Road and historic South Rim Drive along the Grand Canyon of Yellowstone, replacing the visitors’ boardwalk around the geothermal features of Biscuit Basin.
Dustin Seme, a radio technician for the National Park Service who waited for two hours to hear Biden speak, said work this summer has been booming, keeping contractors from nearby areas like Bozeman with jobs.
“When you look at the infrastructure of a lot of the park service, it’s way outdated, falling down. I think it is very overdue,” Seme said.
ASSOCIATED PRESS
| MOST POPULAR STORIES |
- How to suspend a 13-storey tower over a century-old four-storey structure
- Toronto Maple Leaf Gardens time capsule included construction details of arena
- Caterpillar dispute a factor in CAW-CEP union merger talks
- Harley Davidson to roar into Quebec, with $15-million franchise headquarters under construction
- Future unclear for price of iron ore, scrap steel, rebar
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 333 projects with a total value of $7,273,203,495 that Reed Construction Data Building Reports reported on Thursday.
STADIUM, BERMS, PARKING GARAGE, SITE WORKS
$129,300,000 Ottawa ON Tenders
$80,000,000 North York ON Tenders
CONDOMINIUM APARTMENT BUILDING, RETAIL
$75,000,000 Toronto ON Prebid
| CURRENT STORIES |
- Ontario Road Builders’ Association focused on partnerships at convention
- Construction continues on the Regent Park Aquatic Centre in Toronto
- BML Multi Trades president Jim DiNovo takes helm of Hamilton-Halton Construction Association
- Seeing the sustainable forest for the trees
- Steel hurdles for Aga Khan Museum build
- Milton, Ontario council approves velodrome for 2015 Pan Am games
- ASHRAE, International Association of Plumbing and Mechanical Officials plan to cooperate on codes, standards
- MOD Developments 60-storey Massey Tower to include restoration of 1905 Toronto bank
- ERA Architects to conduct study for possible heritage district in Picton, Ontario
- Burlington, Ontario announces preferred hospital redevelopment site
- Bing Thom Architects to design Surrey Performing Arts Centre
- Wind farm contract awarded
- Opposition grows after deal collapses
- $1.8 billion in improvements planned for Vancouver airport
- When low bidders sue over contracts
- North Vancouver condos take shape
- U.S. firms expect fewer layoffs in 2012
- Maple Leaf Gardens time capsule discovered
- A look at Canada's historic concrete ship
- Partnership announced between File Hills Qu'Appelle Tribal Council and Graham Business Trust
- Mike Holmes-designed community in Alberta gets go ahead
- Province of British Columbia contributes cash to green energy projects
- Program for upcoming apprenticeship forum released
- New VRCA chair elected
- Construction union wage index remains the same
- Alberta government orders immediate site remediation
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Canada’s leading indicator series continued to charge ahead in December (January 23, 2012)
- 2012 holds promise but there’s no denying the uncertainty (part 2) (January 12, 2012)
- 2012 holds promise but there’s no denying the uncertainty (part 1) (January 11, 2012)
- More








