January 25, 2012
How British Columbia Supreme Court decided when low bidders sued over construction contracts
Bid Protest Bulletin | Paul Emanuelli
The legal defensibility of a low bid bypass decision will depend on the transparency of the factors relied on by the owner.
For example, in its decision in Tercon Contractors Ltd. v. British Columbia, the British Columbia Supreme Court held that preferences for factors other than price were acceptable as long as those preferences were disclosed in the tender call. The case involved a highway construction project on Vancouver Island. The low bidder, who proposed using steel to build the bridge, was bypassed in favour of a higher bid due to the Ministry of Transportation and Highway’s undisclosed preference for concrete. The low bidder sued, alleging that it should have been awarded the contract. The court agreed, finding that the concrete preference should have been disclosed.
The court found that if the Ministry preferred concrete even where that material was more expensive, then this preference “should have been quantified and the defendant ought to have informed all bidders that the concrete alternative would be preferred and by how much.”
Bid Protest Bulletin
Paul Emanuelli
The court found that the Ministry’s failure to disclose this evaluation factor amounted to the use of a hidden preference which “in effect incorporated an implied term with respect to its preference for concrete without giving notice to all bidders.” This undisclosed preference for concrete resulted in an unfair advantage to the winning bidder. The Ministry appealed but the decision was upheld by the British Columbia Court of Appeal. The plaintiff was ultimately awarded over $1 million in lost profit damages due to the Ministry’s hidden evaluation preference.
In contrast, in its decision in W.I.B. Co. Construction v. Central Okanagan School District No. 23, the British Columbia Supreme Court found that the owner was entitled to bypass the low bidder due to concerns with that bidder’s proposed site supervisor. The case involved a tender call for the construction of a school.
The court agreed that it is improper to disqualify a low bidder due to undisclosed criteria:
An owner may not arbitrarily or capriciously refuse to award Contract B to the lowest bidder since this would undermine the bidding system that has been developed over the years. It is quite improper for an owner to disqualify a bidder on criteria not disclosed in the Call for Tenders.
However, the court disagreed with the plaintiff’s assertion that the owner’s concerns over the proposed site supervisor constituted an improper hidden evaluation factor:
The defendants’ position is simply that the plaintiff’s proposed site supervision was so deficient that W.I.B. Co. was not a qualified bidder. The defendants go on to say that this decision was not made on the basis of some undisclosed term but rather from a concern about site supervision, which must have been evident to all bidders from the stipulation contained in the tendering documents that the name and resume of the proposed site superintendent had to be submitted with the bid.
Although the tender documents do not explicitly say so, it is reasonable to expect a bidder to recognize that the identity of the site superintendent would be an important factor in determining whether a bid was qualified.
This decision illustrates how an owner is entitled to depart from industry norms when making contract award decisions so long as it discloses the additional evaluation criteria it will rely on and applies those criteria in a fair and objective fashion. In the specific situation, the district’s request for information regarding the bidder’s proposed supervisor was found to be sufficient to negate any assertions of hidden criteria.
Paul Emanuelli’s procurement law practice focuses on all aspects of the tendering cycle including bid dispute resolution. This article is extracted from Emanuelli's Government Procurement textbook published by LexisNexis Butterworths.
Reach Paul at paul.emanuelli@procurementoffice.ca.
| MOST POPULAR STORIES |
- Drummond report on Ontario public service recommends full cost pricing for municipal water
- Drummond report makes sweeping public transit reform recommendations for Ontario
- Drummond report suggests expanded role for Ontario College of Trades
- How Ryerson University engages the private sector to build in Toronto
- Ontario College of Trades announces apprenticeship ratio reviews
- 20 Most Popular Stories
| TODAY’S TOP CONSTRUCTION PROJECTS |
These projects have been selected from 291 projects with a total value of $8,718,524,867 that Reed Construction Data Building Reports reported on Tuesday.
$1,500,000,000 Kenora District ON Prebid
$1,400,000,000 Kenora District ON Prebid
$1,000,000,000 Kenora District ON Prebid
| CURRENT STORIES |
- Contractors face challenges in MaRS Discovery District construction in Toronto
- Bluescape, Urban Capital work on River City in Toronto
- Metrolinx, Ontario Road Builders’ Association contemplate joint transit contractors’ council
- Are we making the right choices to foster green economy?
- Funding announced for Sept-Iles, Quebec port facility construction
- Italian court convicts two men in asbestos-related deaths
- Westmount, Quebec awards $38-million design-build recreation centre construction contract
- Environmental assessment starts for Alderon open pit iron ore mine in Labrador
- Capital spending takes a small hit in tight B.C. budget
- Apprenticeship tax credit extension draws mixed reviews
- Capital spending breakdown for B.C. budget
- Concrete additives speed Saskatchewan tower construction
- Apprenticeships important as labour shortage looms
- Budget could be balanced with construction delays: Wildrose Party
- Timing is everything in bid bond disputes
- Wood frame apartments take shape in Nanaimo
- Steel/precast concrete system helps beat the elements in Edmonton Alta.
- How to suspend a tower over a four-storey structure
- PST transition rules are best possible solution for construction industry
- Manitoba winter roads now open
| ALEX’S ECONOMICS BLOG |

Reed Construction Data Canada’s Chief Economist Alex Carrick discusses current developments in the North American economic environment with emphasis on the construction industry.
- Good news on U.S. housing and employment is positive for Canada as well (February 16, 2012)
- Home starts and job levels diverge in Canada and the U.S. (February 8, 2012)
- Canada’s labour market flat in January but U.S. on a roll (February 3, 2012)
- More